FAQ
2024.08.18
How Long Does Custom Packaging Take?
From design approval to final delivery, we break down the typical lead times for manufacturing custom flexible packaging.

The standard lead time is 15-20 days. This includes cylinder engraving (3-5 days), printing and lamination (5-7 days), curing (2-3 days), and pouch making/QC (3-5 days). Shipping times vary based on your global location.




